Bunge Deutschland GmbH


Verification of the deaeration system in the extraction (2014)

  • Pressure loss calculations
  • safety checks

Built-in documents in the production range Extraction I and II (2012)

  • Built-in documentation
  • Compilation of P & I flow charts

Planning for the construction of a new central re-cooling system, performance 9 MW (2010 till 2011) - Complete detail engineering - Built-in documentation - Process design for the new plant - Compilation of P & I flow charts - Specification of equipment - Enquiry of equipment - Layout planning - Pipeline planning - Construction guidance - Comissioning - Dokumentation


Planning for the construction of a new compressed air centre (2010 till 2011) - Complete detail engineering - Built-in documentation - Process design for the new plant - Compilation of P & I flow charts - Specification of equipment - Enquiry of equipment - Layout planning - Pipeline planning - Reconnections concept for uninterrupted continuation of production - Construction guidance - Comissioning - Dokumentation