Skip to main content

BK Giulini GmbH


Construction of an additional rainwater storage tank (2013)

  • Prearrangement
  • Cost estimation

Planning for the extension of the production in the food-range, construction of new mixing- and package-plants (2013)

  • Detail planning

Planning for the exchange of a storage tank (2012)

  • Planning
  • Construction guidance
  • Commissioning

extension of the compressed air centre through an additional screw compressor (2012)

  • Planning
  • Construction guidance
  • Commissioning

Planning for the extension of the production in the food-range, construction of new mixing- and package-plants (2012)

  • Prearrangement
  • Cost estimation

New conception of the cooling water supply in the range cooling drum and batch furnaces (2011)

  • Planning
  • Construction guidance
  • Commissioning

Prearrangement for the assembly of an own well water-supply (2011)

  • Prearrangement
  • Cost estimation

Prearrangement for the extension der rainwater-storage (2011)

  • Prearrangement
  • Cost estimation

Planning for the construction of a new water treatment plant - rainwater (2011)

  • Planning
  • Construction guidance
  • Commissioning

Planning for the construction of a new water treatment plant - demineralised water (2007 till 2007)

  • Planning
  • Construction guidance
  • Commissioning