Trust a partner with years of experience from countless successful projects. You will find some of our projects on this page. See for yourself: Your project is in good hands with us – and if not, we will guide you to the right direction.

Plant expansion and reconstruction of a hazardous waste incineration plant.

Hazardous waste incineration plant

Expansion and reconstruction of a tank car unloading station for the co-incineration of liquid waste in a hazardous waste incineration plant

Valorec Services AG
300 kg/h Throughput

Read More

Planning & construction of a plant incl. explosion protection

New construction of a tin-sulfate plant

Planning and construction of a plant for the production of tin sulfate, in consideration of explosion protection

TIB Chemicals
approx. 1,600t per year

Read More

Plant design and construction of a EBRI demonstration plant

EBRI Demonstration plant

Planning and construction of an experimental plant for the energetic conversion and utilization of biomass

Wehrle-Werk AG
approx. 340 kg/h Fluidized bed gasifier

Read More

Basic Engineering of a plant for the production of zinc chloride

Zinc chloride plant

Basic Engineering of a plant for the production of zinc chloride

TIB Chemicals
12,500 t/year output zinc chloride

Read More

Planning of a degasser dome

Preplanning spit water tank

Planning of a degasser dome

Energiedienstleistungen Rhein-Neckar GmbH
2x 32t/h steam

Read More

Heat exchanger calculation

Planning of a condensate system as a tube-bundle heat exchanger

BK Giulini
1.8 MW

Read More

Druckverlustberechnung & Wärmetechnische Berechnung

Warm water system

Pressure loss calculation & thermal calculation for a warm water system

BK Guilini
5 t/h

Read More

Realization of a fire protection concept

Fire extinguishing system

Realization of a fire protection concept with planning and construction of a new fire water tank

Haltermann Carless Deutschland GmbH
3,000 m³/h Extinguishing water

Read More

Planning and construction of a fire extinguishing system for the port of Mannheim

Fire extinguishing system port basin

Planning and construction of a fire extinguishing system for the port of Mannheim, in accordance with the requirements of the authorities and fire protection reports

Minera
800 m³/h fire extinguishing water

Read More

Intergrationsplanung und Koordination der Gewerke für den Bau einer neuen Desodorierkolonne

Deodorizing column

Integration planning and coordination of the trades for the construction of a new deodorizing column and its integration into the existing systems

Bunge GmbH
approx. 24,480 kg/h Oil

Read More

Planning for the construction of a new central recooling system.

Recooling system

Planning for the construction of a new central recooling system

Bunge GmbH
9.000 kW Cooling capacity

Read More

Cooling system

Haltermann Carless Deutschland GmbH

Read More

Planning for the reconstruction of an existing thermal oil station

Thermal oil station

Planning for the reconstruction to upgrade an existing thermal oil station

Haltermann Carless Deutschland GmbH

Read More