GET mbH

Novatec Solar GmbH

 

Extension Puerto Errado 1 (2010)

  • Construction set-up planning
  • Pipeline planning and calculation
  • Testing through TÜV Süd
  • As-built documentation

 

Solar power plant in Spain Puerto Errado 1 (2008)

  • Construction set-up planning
  • Pipeline planning and calculation
  • Testing through TÜV Süd
  • As-built documentation

 

Special requirements:

  • Steam-powered 2 MWe solar power plant
  • Design in accordance with EN 13480-3 and EN 12952
  • Wet steam design data: 330 °C, 76 bar, 5 kg/s





 

BACK TO THE REFERENCES