GET mbH

Maxxtec AG

 

Pipeline planning with isometry-compilation and pipe-statics for the new construction of a thermal-oil-plant in Abu Dhabi (2012)

 

Pipeline planning with isometry-compilation and pipe-statics for the new construction of a thermal-oil-plant with CAD 3D model in Mavera (2008)

 

Pipeline planning with isometry-compilation for the new construction of a thermal-oil-plant with CAD 3D model (2007)

 

Pipeline planning with isometry-compilation and steel construction detailed planning for the new construction of a thermal-oil-plant with CAD 3D model in Belgium (2006)

 

Planning of a thermal oil plant to provide the power supply for a BASF AG construction at the Freeport / Texas site (2006)

  • Complete planning of the plant inclusive 3D model design
  • Pipeline planning and calculation in accordance with ASME
  • Construction management in Texas / USA

 

Special requirements:

  • Planning and calculating in accordance with US and BASF standards under difficult conditions (wind speeds of up to 210 km/h in an earthquake zone)


Planning of a thermal oil plant with ORC module for the production of thermal heat and electricity (2006)

  • Complete planning of the plant inclusive 3D model design
  • Pipeline planning and calculation
  • Coordination of subcontractors
  • As-is documentation

 

Planning of a thermal oil plant with ORC module for a sawmill in southern Germany for the production of thermal heat and electricity (2006)

  • Complete planning of the plant inclusive 3D model design
  • Pipeline planning and calculation

 

BACK TO THE REFERENCES