Verification of the deaeration system in the extraction (2014)

  • Pressure loss calculations
  • safety checks

 

Built-in documents in the production range Extraction I and II (2012)

  • Built-in documentation
  • Compilation of P & I flow charts

 

Planning for the construction of a new central re-cooling system, performance 9 MW (2010 till 2011)

  • Complete detail engineering
  • Built-in documentation
  • Process design for the new plant
  • Compilation of P & I flow charts
  • Specification of equipment
  • Enquiry of equipment
  • Layout planning
  • Pipeline planning
  • Construction guidance
  • Comissioning
  • Dokumentation

 

 

Planning for the construction of a new compressed air centre (2010 till 2011)

  • Complete detail engineering
  • Built-in documentation
  • Process design for the new plant
  • Compilation of P & I flow charts
  • Specification of equipment
  • Enquiry of equipment
  • Layout planning
  • Pipeline planning
  • Reconnections concept for uninterrupted continuation of production
  • Construction guidance
  • Comissioning
  • Dokumentation

 

 

 