GET mbH

Adam Opel AG


Planning renewal cooling tower system (2005)

  • Built-in analysis of existing plant
  • Concept development for the gradual exchange of the plant without the need for interrupting production
  • P & I flow chart
  • Arrangement plan
  • Strip map
  • Component specification
  • Plant and operation description
  • Guidelines for E/I&C planning
  • Specifications
  • Costing

 

BACK TO THE REFERENCES